The Pepper Mill – Luxury Student Accommodation in Edinburgh for Danehurst Developments Limited

  • Project Overview

    The Pepper Mill is a brand-new purpose-built student accommodation development in Edinburgh, delivered for client Danehurst Developments Limited. The project comprises 155 self-contained studios plus extensive communal amenity spaces — offering a modern, comfortable, and sustainable “home away from home” for students.

    Communal area has been outfitted with high-quality interior finishes, including kitchens, fitted wardrobes, and furniture, using premium Italian and European brands via the DA Group (notably Dall’Agnese and Comprex) — ensuring durability, design cohesion, and a contemporary aesthetic throughout the development.


    Accommodation Details: Studios & Interiors

    Studios (155 Units)

    • Self-contained studios, each with private kitchenette, ensuite shower/bathroom, and student-appropriate furniture.

    • Studios furnished with quality wardrobes, and integrated kitchenettes; layouts designed to maximise comfort and functionality for students.

    Interior Fit-Out (Kitchens & Furniture by DA Group)

    • Kitchens and interiors specified through DA Group, utilising Comprex for kitchen/living units and Dall’Agnese for wardrobes, storage and furniture — ensuring a cohesive modern-European design throughout.


    Design Philosophy & Quality

    The Pepper Mill blends practicality with quality and design integrity. By using DA Group’s Comprex kitchens and Dall’Agnese furniture/wardrobes, each studio delivers a refined living space that stands out compared to typical student halls.

    Conclusion

    The Pepper Mill represents a forward-thinking approach to student accommodation: combining private, well-appointed studios, reliable and stylish interiors via DA Group’s Comprex and Dall’Agnese, and extensive communal and lifestyle amenities — all packaged inside a sustainable, high-performance building developed by Danehurst Developments Limited.

  • Project Type: Commercial
  • Address: The Pepper Mill - Edinburgh
  • Completed:August 2025
  • Duration: 6 months
  • Provision:Kitchens · Wardobes